docs(rust): phase 15 plan of record — the map and events on a phone (PLAN.md §31)
Android leg D. D121-D125: the map drawn natively in Compose as a fifth tab gated on `map`, polled every 10 s; a site-event marker opening the app's own event page, which needs runId on core's public calendar entries; and M13 walked against a Rust run. Android plan gains M17. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01E14m6SuuY6i1vASFeGDBeY
This commit is contained in:
@@ -1579,6 +1579,26 @@ push, and Play (M6–M8) follow the designed app.
|
||||
pins it), and the lock-screen rendering (the emulator has no screen lock; the public version was
|
||||
read back from `dumpsys notification`).
|
||||
|
||||
18. **M17 — the Rust map and events on a phone** (post-v1; planned 2026-09-25). `module-rust`
|
||||
phase 15, R10's leg D. **Design of record:
|
||||
[`../modules/rust/PLAN.md`](../modules/rust/PLAN.md) §31**, with its five decisions
|
||||
(D121–D125).
|
||||
|
||||
- **The map is a fifth tab on the Rust server screen**, between Online and Wipes, shown when the
|
||||
module declares `map`. It is drawn natively: Coil loads the picture and a Compose `Canvas`
|
||||
draws the layers, with pinch and pan. The app gains no dependency.
|
||||
- **The layer gates are the server's.** `map/live` is projected per viewer on the server, and a
|
||||
layer the viewer may not see is absent from the answer. The app draws what it is sent, and it
|
||||
lists each missing layer with who can see it.
|
||||
- **It polls every 10 seconds** while resumed and on the tab. The other tabs keep 20.
|
||||
- **A site-event marker opens the app's own event page on its run.** That needs `runId` on
|
||||
core's public calendar entries (D125, a website change). A rehearsal's or an unlisted event's
|
||||
marker stays unlinked.
|
||||
- **M13 is walked against a Rust run** for the first time: participant names from the module's
|
||||
meta, fractional scores, *My events*.
|
||||
|
||||
Excluded, as M14 excluded it: the admin Map card, which is operator configuration.
|
||||
|
||||
### Deferred (not a milestone)
|
||||
|
||||
- **Platform Teams in the app** — **deferred 2026-08-17, no app work scheduled.** The website is
|
||||
|
||||
Reference in New Issue
Block a user