docs(runicnpc): stage 8 built and walked; MODULE_API 1.12.0 progress(), map.live's RunicNPC rows #323

Merged
whitlocktech merged 2 commits from docs/runicnpc-stage8-built into main 2026-10-06 13:32:17 +00:00
Showing only changes of commit 1158a9c8a5 - Show all commits

View File

@@ -1517,7 +1517,7 @@ in the Android app.
- `rust-link/PROTOCOL.md` §17.3.
- The integration kit, read again and its pin moved.
**Built (2026-10-06), five branches and this one.**
**Built (2026-10-06), six branches and this one.**
| Piece | Branch | What it does |
|---|---|---|
@@ -1553,8 +1553,13 @@ stood in for a player.
for every event the editor authors. It has done so since Events Phase 14a; its test used an `id` fixture. A one-line
fix in `eventPublic.model.js`, raised with the org lead rather than folded into website#210.
**Still to do when website#210 merges:** the integration kit's `ci/core-ref.json` pin moves to that sha, and its
`coreApi` with it, after the kit is read again for 1.12.0.
**The integration kit** (`Integration-kit` `docs/core-1.12.0`). website#210 merged as `0a37a44`, and the kit's pin
moved there from 1.10.0, past 1.11.0, which it had skipped.
- Chapter 5 was read again for both versions and teaches `progress()` and `ctx.events.expired`.
- The template's `coreApi` is `^1.12.0`.
- Every kit check and template suite passed at the new pin, and the template registered in a real core of that
code.
### Stage 9 — Hardening and release