The last phase of the workstream. ENGAGEMENT.md gets Phase 14's as-built
(the six org-lead decisions, three findings, the acceptance line discharged
and one rig trap), and its header now reads COMPLETE rather than "Phase 14
is scoped and not started".
BACKEND_DESIGN.md gets the reference: a new "Engagement retention" section
with the horizon table, why the outbox sweep is terminal-only, why each
floor is a correctness bound rather than a UI nicety, why suppressions do
not expire, and why this one got a screen when team_activity and
user_notifications did not. Plus the three new routes in the admin table and
the address_hash reversal on GET /suppressions.
Three findings worth not re-deriving:
* the per-row purge could not be built without reversing Phase 9's
decision to strip address_hash — the row had no handle, and the existing
lift asks for an address the screen has never shown.
* reclaimStale could not give up, so an interrupted send never became
terminal and no retention sweep could ever have bounded the outbox.
* the cooldown warning is unreachable through the UI by construction
(MAX_COOLDOWN_SECONDS is smaller than the horizon's floor). It is not
dead: it catches a hand-edited row, and a future raise of that ceiling.
And one the phase text got wrong in the other direction: the Play Data
Safety answers correctly did NOT move, because deploy-engagement is
deployment-scoped and PLAY_DATA_SAFETY.md is generated from the app-scoped
entries only.
Code: website#TBD.
Co-Authored-By: Claude <noreply@anthropic.com>