All checks were successful
PR checks / checks (pull_request) Successful in 1m19s
The image measures 757 MB, not the ~600 MB the requirements table guessed. And until the rgcom runner exists the deploy job simply queues, which is worth stating in both the workflow and DEPLOY.md: build has already published the image by then, so the manual pull works throughout and the queued job goes when the runner does. Co-Authored-By: Claude <noreply@anthropic.com>