Commit Graph

3 Commits

Author SHA1 Message Date
e5548472da fix(cutover): gate 1 asks Steam when public was set, not the manifest's date or staging (D332)
All checks were successful
PR Checks / plugin-checks (pull_request) Successful in 29s
The 2026-11-05 weekend never cut over: gate 1 blocked every hourly run. Both of
its checks rested on assumptions the wipe disproved:

- The wipe build went live Thursday evening, but its depot manifest is dated
  11-04: the date DepotDownloader prints is when Facepunch built it.
- Public never names staging's manifest. Facepunch promotes a hidden `release`
  branch ("Release, before public"), and staging had moved on before the wipe.

Gate 1 now reads Steam's app info (steamcmd +app_info_print 258550, kept by
static.sh as appinfo.txt with BRANCH=public): branches.public.timeupdated must be
on the wipe day or later, and the Linux depot manifest Steam names for public
must be the one the static half downloaded. The staging static half is gone from
edge's cutover.yml; --staging-work is still accepted, since main's copy passes it
until the cutover merge carries the new wiring over.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_014HJEmgsXtLR5kLfh7f9y8P
2026-11-06 04:37:50 -06:00
29226ab450 ci(cutover): no Closes listed twice, room for the worst case, the checkout pinned (D332)
All checks were successful
PR Checks / plugin-checks (pull_request) Successful in 14s
From the second review:
- A PR whose merge commit main already has is not listed again. edge's tip at
  a cutover is often that PR's merge commit, and its merged_at can be a moment
  after the cut-off's committer date, so its issues would have had the next
  release's comment too.
- timeout-minutes 240: the worst case is about 200, and a timeout must never
  cut off the step that starts rust-carbon again.
- A test pins the checkout: edge, except on a dry dispatch that names code_ref.

Dry run (CI run 54, before these): every gate refused for the right reason.
Public Rust is still the 22 October build, which lacks the three fields edge
carries for November, and gates 1 to 4 each saw it; the panel key wrote to,
restarted and read rust-carbon; the live half ran 266 pass, 0 fail; nothing
was opened, edited, commented or merged.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01E14m6SuuY6i1vASFeGDBeY
2026-11-02 07:08:47 -06:00
512efa77cb ci(cutover): the wipe-day edge → main cutover, once five gates pass (D332)
A workflow that merges edge into main on the forced-wipe weekend with no
approval: hourly from Thursday 17:00 UTC to Sunday 23:00 UTC, through five
gates in order, then a merge commit made with RUNICNPC_TOKEN (that step only)
so release.yml cuts the release.

1. Rust's public build changed: dated the wipe day and naming the same depot
   manifest as staging (the staging build was promoted to live).
2. Oxide's public release caught up, RunicNPC compiles, the swap's fields match.
3. A Carbon boot on public Rust: rust-carbon proves the public manifest is
   installed, and rnpc.status says framework carbon, navmesh ready,
   missing=- added=-.
4. The drill's live half on public Rust with edge's plugin and harness.
5. PR checks, run fresh on the cutover PR's head just before the merge.

Gates are kept in drill.json for one (wipe, public manifest, edge commit);
any change runs them again. A failed Carbon or live attempt cools down for
3 hours. The merge is pinned to the commit the gates ran on. The cutover PR
lists every `Closes #N` from the PRs merged into edge since the last cutover,
so those issues close on the merge; afterwards each gets the release version.
One comment a day while a gate blocks; at the deadline it hands back.

The copy on main is only the trigger and step wiring; every step runs edge's
code (a dry dispatch may name another branch, code_ref). Dispatches are dry
unless dry_run is exactly false. rust-carbon is started again if the job left
it stopped. drill.js only gains exports; its report already kept other keys,
now tested.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01E14m6SuuY6i1vASFeGDBeY
2026-11-02 06:15:16 -06:00