All checks were successful
PR Checks / plugin-checks (pull_request) Successful in 14s
From the second review: - A PR whose merge commit main already has is not listed again. edge's tip at a cutover is often that PR's merge commit, and its merged_at can be a moment after the cut-off's committer date, so its issues would have had the next release's comment too. - timeout-minutes 240: the worst case is about 200, and a timeout must never cut off the step that starts rust-carbon again. - A test pins the checkout: edge, except on a dry dispatch that names code_ref. Dry run (CI run 54, before these): every gate refused for the right reason. Public Rust is still the 22 October build, which lacks the three fields edge carries for November, and gates 1 to 4 each saw it; the panel key wrote to, restarted and read rust-carbon; the live half ran 266 pass, 0 fail; nothing was opened, edited, commented or merged. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01E14m6SuuY6i1vASFeGDBeY