Commit Graph

4 Commits

Author SHA1 Message Date
9bc0bf5a3d feat(events): conditions, phase advancement and the diagnosis panel (Phase 5)
All checks were successful
PR Checks / bot-tests (pull_request) Successful in 31s
PR Checks / server-tests (pull_request) Successful in 5m28s
PR Checks / client-build (pull_request) Successful in 8m47s
A phase used to advance on one fact - every step terminal. It can now also carry
an advance CONDITION: `{ after: '30m' }` or `{ on: '<triggerId>', where:
<conditions>, count: n }`, reusing `engagement/conditions.js` unchanged. The
phase's real deliverable is the diagnosis panel: "why didn't phase 3 start?"
answered in the condition builder's own words, with the tally, the elapsed time
and the last related firing whether or not it counted.

`POST /admin/events/runs/:runId/advance` arrives beside it. It has been absent
since Phase 3 for want of a meaning; a phase with a gate can wait on a boss that
will never spawn, and that is the one state "force it anyway" names.

One new table, `event_run_phase_gates`. The emit path writes the tally at the
moment a firing happens - a gate waiting on three spawns counts things that
occur between two ticks, and a tally held in a process's memory is one a restart
silently zeroes - and the runner's tick reads it.

A gate that never opens is HELD, with no automatic advance and no authored
timeout (org lead, 2026-09-02). What the engine owes instead is visibility:
`EVENT_PHASE_STALL_MS` takes the run's health to `stalled`, and `setHealth` is
now escalation-only so a later retry cannot demote it.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01T6t8mrAWhZU5vnyYgZTMtL
2026-09-02 22:11:20 -05:00
6e73660b52 feat(events): schedule, recurrence and the calendar (Phase 4)
All checks were successful
PR Checks / bot-tests (pull_request) Successful in 37s
PR Checks / client-build (pull_request) Successful in 43s
PR Checks / server-tests (pull_request) Successful in 13m26s
The four closed recurrence shapes computed in the definition's own IANA zone,
a fourteen-day materialisation horizon with projections beyond it, series as a
managed thing, and the admin calendar that replaces the plugin this feature
exists to replace. An event now happens on its own.

No schema change: Phase 1 built every column this needed.

- events/recurrence.js is the ONE place an occurrence is computed, so the
  runner's expansion and the calendar's forecast cannot disagree. No date
  library added — Node ships the tzdata one would vendor, behind Intl.
- The runner's materialise leg is now two halves: expand, then sweep. The
  window starts at `now - grace`, so an occurrence nobody could have seen is
  never invented retroactively; the horizon is what makes the missed sweep
  mean anything for a recurrence.
- Publishing is the schedule switch and archiving turns it off, and publishing
  re-pins every occurrence that has not started.
- A projection is never drawn over an instant a run occupies, so a cancelled
  occurrence does not reappear as a forecast.

54 new tests, incl. the DST fixture set the plan asked for and three new
statements proved against a real MariaDB. Suite 1768/1711/56 skipped/1 fail
(pre-existing CRLF). Walked end to end on the local review stack.

Docs: RunicGateway/docs#PENDING

Co-Authored-By: Claude <noreply@anthropic.com>
2026-09-02 16:10:16 -05:00
7b570c8ea1 feat(events): the minimal admin surface (Phase 3)
All checks were successful
PR Checks / bot-tests (pull_request) Successful in 30s
PR Checks / server-tests (pull_request) Successful in 5m26s
PR Checks / client-build (pull_request) Successful in 8m30s
Three screens, an Events nav group and the six live run controls Phase 1 left
absent on purpose because nothing was in flight. An admin can now author,
publish, start and watch an event that announces things and cues a human; a
moderator can stop one that is going wrong.

Six controls, not eight. `advance` is absent because a phase today advances when
its steps go terminal — the per-step skip already does that — and Phase 5 is what
gives a phase an advance condition. Cancel takes `{ reason }`, not `{ cleanup }`,
until Phase 8's ledger exists. Every control is a compare-and-set on the status it
may act from, so a console rendered thirty seconds ago cannot act on a run that
has moved.

Fixes a defect in the Phase 2 runner: `advanceRun` drained up to
EVENT_STEPS_PER_TICK steps while only checking the run's status at the top of the
tick, so a pause pressed mid-batch did nothing for up to 24 more steps.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01T6t8mrAWhZU5vnyYgZTMtL
2026-09-02 08:39:35 -05:00
2e964cfeee feat(events): the runner (Phase 2)
All checks were successful
PR Checks / bot-tests (pull_request) Successful in 32s
PR Checks / client-build (pull_request) Successful in 33s
PR Checks / server-tests (pull_request) Successful in 5m29s
`utils/eventRunner.js`, the eighth poller, wired into server.js beside
engagementWorker. Its tick reclaims stale leases, sweeps occurrences past their
grace window into `missed`, advances each due run through its phases, and drains
that phase's steps in `seq` order. The three core actions from Phase 1 get real
bodies, so a published event started from the existing run route now announces,
waits and completes on its own.

No routes are added: a runner has no surface, and the live controls stay Phase
3's.

Four things the org lead settled (2026-09-02): a parked step is `running` with a
NULL lease; `await: 'human'` and `holdFor` are ordinary success-envelope members
rather than special cases keyed on an action id; a run whose concurrency key is
held stays `scheduled` and lets its grace window decide; and `n` in §L's
`retry(n)` is a runner constant.

Co-Authored-By: Claude <noreply@anthropic.com>
2026-09-02 06:32:24 -05:00