Phase 8 — Guardrail vendor sourcing (manual-first) #11

Open
opened 2026-08-08 19:36:53 +00:00 by wtclaude · 0 comments
Collaborator

Size: small · Depends on: Phases 2 and 7

Scope

  • Manual paste-a-document flow producing proposed guardrails into the existing approval queue
  • Vendor suggestions stay quarantined from project policy until explicitly approved, at which point they are promoted into the canonical guardrails: list with their own provenance record
  • Automated vendor-doc fetching only if the manual workflow proves its worth

Exit criterion

A vendor guidance document becomes a reviewable proposal that requires explicit approval before entering the canonical ruleset. Nothing auto-merges.

Rationale for the downgrade

The design doc specified a periodic job scraping vendor docs. Scraping is fragile and breaks constantly; the manual path captures most of the value at a fraction of the cost and maintenance burden.

**Size:** small · **Depends on:** Phases 2 and 7 ## Scope - Manual paste-a-document flow producing **proposed** guardrails into the existing approval queue - Vendor suggestions stay quarantined from project policy until explicitly approved, at which point they are promoted into the canonical `guardrails:` list with their own provenance record - Automated vendor-doc fetching **only** if the manual workflow proves its worth ## Exit criterion A vendor guidance document becomes a reviewable proposal that requires explicit approval before entering the canonical ruleset. Nothing auto-merges. ## Rationale for the downgrade The design doc specified a periodic job scraping vendor docs. Scraping is fragile and breaks constantly; the manual path captures most of the value at a fraction of the cost and maintenance burden.
wtclaude added this to the v1.0 — Agentic Bridle milestone 2026-08-08 19:36:53 +00:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: whitlocktech/Agentic-Bridle#11
No description provided.