2026-09-14 - 2026-09-17
Overview
13 Pull requests merged by 2 users
Merged
#257 docs(modules): phase 5 as built — Android leg A, and the capability a client had to be given
Merged
#256 docs(modules): phase 4 as built — the first pages, and the four defects a browser walk found
Merged
#255 docs(rust-link): protocol 2 — the read path, and phase 3 as built
Merged
#254 docs(modules): phase 2 as built — packaging, release and the frozen manifest
Merged
#253 docs(modules): module-rust supports Carbon too, ships a Pterodactyl egg, and the rigs move to the panel
Merged
#252 docs(modules): module-rust phase 1 as built — the transport, and three org-lead decisions
Merged
#251 docs(modules): module-rust phase 0 as built — the rig is current, and four plan claims were wrong
Merged
#250 docs(modules): second contract pass over MODULE_API.md — restores a dropped reconcile, reprices R9
Merged
#249 docs(modules): the module-rust plan — 18 decisions of record and a 21-phase schedule
Merged
#246 docs(tree): sync website/PROJECT_TREE.md
Merged
#248 docs(modules): mirror the uMod/Oxide ecosystem for module-rust
Merged
#247 docs(link): the site leg, and the nine keys no phase row could catch (Phase 9c, the last)
Merged
#245 docs(link): the cutover, and the counter two branches bumped at once (Phase 9b, 5 of 5)