docs(runicnpc): stage 9e is three steps — the session's asks, the Carbon check, the cutover #329

Merged
whitlocktech merged 1 commits from docs/runicnpc-9e-scope into main 2026-10-09 06:13:30 +00:00

1 Commits

Author SHA1 Message Date
577209cfc4 docs(runicnpc): stage 9e is three steps — the session's asks, the Carbon check, the cutover
The org lead put all three in 9e (2026-10-09): the default dome at 3 spheres and the
recommended PopupNotifications banner (docs, installer, egg) first, so the cutover
ships them; then the Carbon Kits reload checked on a real first boot; then the
coordinated v1.0.0 release.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01E14m6SuuY6i1vASFeGDBeY
2026-10-09 01:12:52 -05:00