The status section still said "Phases 1 to 4 are built, on edge. Nothing
is released yet" and told visitors the way to install was by hand — both
untrue as of v0.1.0.
- Add an "Install a shard with it" section up top: verify, run, paste the
four values. That is what a visitor to this repo is here for.
- Status: released, all five phases, both cutover gates recorded.
- Fix a broken link: bundles/current.json is no longer on main, it lives
on the bundles branch.
Co-Authored-By: Claude <noreply@anthropic.com>