2026-05-10 - 2026-11-10

Overview

50 Active Pull Requests
0 Active Issues
Excluding merges, 1 author has pushed 1 commit to main and 62 commits to all branches. On main, 2 files have changed and there have been 234 additions and 0 deletions.

50 Pull requests merged by 1 user

Merged #50 ci(image): clean up after the image build and the deploy 2026-11-04 06:11:02 -06:00

Merged #49 fix(app): turn the APK download back on for v0.7.0 2026-10-31 00:38:38 -05:00

Merged #48 feat(app): quote Android v0.7.0, with report, block and hide and account deletion 2026-10-30 18:09:31 -05:00

Merged #47 fix(facts): quote 2026-10-30's releases, and the moderation that 1.21.0 brought 2026-10-30 17:31:48 -05:00

Merged #46 fix(legal): declare report, block and hide in the app's data safety 2026-10-30 11:05:07 -05:00

Merged #45 feat(legal): /delete-account/, the page Google Play is given (D85, D86) 2026-10-30 01:42:56 -05:00

Merged #44 fix(legal): declare what the app sends as collected, not shared (D84) 2026-10-29 17:30:31 -05:00

Merged #43 fix(facts): quote Module-Rust v0.6.3 2026-10-29 06:59:54 -05:00

Merged #42 feat(demo): list the demo's sign-ins on /beta and link into it per game 2026-10-29 05:12:43 -05:00

Merged #41 fix(docker): pin Node 22.23.4 for the image and CI (Node2Shell) 2026-10-27 12:49:08 -05:00

Merged #40 chore(site): weapon names in the Rust shots; Android-app v0.6.0 and Module-Rust v0.5.1 2026-10-23 02:35:47 -05:00

Merged #39 feat(site): phase 18 — the Rust screenshots, web and app 2026-10-22 22:09:18 -05:00

Merged #38 feat(site): phase 17 — per-game module pages, /runicnpc/, and checkTerms over the built site 2026-10-22 20:26:03 -05:00

Merged #37 feat(docs): phase 16 — the RunicNPC subgroup, its API carried in full and drift-checked 2026-10-22 16:07:56 -05:00

Merged #36 docs(plan): phase 15's other-repository findings are fixed 2026-10-22 15:32:26 -05:00

Merged #35 feat(docs): phase 15 — the Rust group, its reference pages checked against their sources 2026-10-22 15:26:33 -05:00

Merged #34 feat(docs): phase 14 — game-neutral core docs, an Ultima Online group, and checkTerms 2026-10-22 14:41:27 -05:00

Merged #33 feat(facts): phase 13 — per-game facts, Rust and RunicNPC checked, main green again 2026-10-22 08:11:15 -05:00

Merged #32 docs(plan): revision 4 — a second game, RunicNPC, and a vocabulary rule 2026-10-22 07:59:56 -05:00

Merged #31 docs(site): the Asset Bridge — protocol 8, a screen for client files, and pictures in the screenshots (Phase 9c) 2026-09-15 07:11:31 -05:00

Merged #30 docs(site): the Event System — the platform's facts, and two pages for it 2026-09-09 23:27:58 -05:00

Merged #29 docs(site): /privacy tells the truth about engagement retention again 2026-09-01 15:57:28 -05:00

Merged #28 docs(site): the engagement system — cutover 7 of 7 (edge → main) 2026-09-01 13:04:23 -05:00

Merged #27 chore(facts): protocol 5, Module API 1.9.0, and the 2026.09.01 bundle 2026-09-01 12:45:18 -05:00

Merged #26 docs(admin): the engagement rules screen, and the privacy inventory an engagement mailer changes 2026-09-01 08:18:57 -05:00

Merged #25 docs(troubleshooting): suppression and bounces (engagement Phase 9) 2026-08-31 10:53:26 -05:00

Merged #24 docs(admin): on-site notifications, and the defaults page that was wrong 2026-08-31 02:23:24 -05:00

Merged #23 docs(admin): Team notification emails are engagement rules now 2026-08-31 01:07:35 -05:00

Merged #22 docs(admin): a page for the message-template editor 2026-08-29 18:37:09 -05:00

Merged #21 docs(admin): email is SMTP now, and the Gmail connect flow is gone 2026-08-28 21:10:16 -05:00

Merged #20 fix(footer): send each documentation link to the section its label names 2026-08-27 00:31:36 -05:00

Merged #19 feat(compose): publish on every interface, so the host's own address answers 2026-08-27 00:07:33 -05:00

Merged #18 fix(image): ship node_modules in three layers, and count them before pushing 2026-08-26 23:23:20 -05:00

Merged #17 feat(delivery): phase 12 — the container, and the defect only a proxy could find 2026-08-26 22:53:56 -05:00

Merged #16 feat(validation): phase 11 — the walk that found what the checks could not 2026-08-25 15:36:59 -05:00

Merged #15 feat(polish): phase 10 — search, accessibility, SEO and a real CSP 2026-08-25 14:28:53 -05:00

Merged #14 feat(screens): retake the two frames a signed-in character changes 2026-08-25 10:38:40 -05:00

Merged #13 feat(screens): phase 9 — real screenshots, from a real shard 2026-08-25 10:04:21 -05:00

Merged #12 docs(builder): phase 8 — modules, architecture and reference 2026-08-24 12:33:24 -05:00

Merged #11 fix(docs): clear the quickstart drift the upstream fixes caused 2026-08-24 12:32:51 -05:00

Merged #10 docs(journey): phase 7 — the installation path and administration 2026-08-24 10:24:20 -05:00

Merged #9 feat(legal): phase 6 — the privacy policy and the terms 2026-08-24 04:28:41 -05:00

Merged #8 feat(beta): phase 5 — the app page and the closed-beta signup 2026-08-24 03:55:02 -05:00

Merged #7 feat(marketing): phase 4 — the marketing pages 2026-08-24 02:53:04 -05:00

Merged #6 feat(home): phase 3 — the homepage 2026-08-20 00:14:02 -05:00

Merged #5 feat(brand): phase 2 — the branding pipeline 2026-08-19 23:36:06 -05:00

Merged #4 feat(site): phase 1 — the foundation 2026-08-19 21:06:31 -05:00

Merged #3 docs(plan): D13 settles the contact address, and Phase 0 is done 2026-08-19 20:36:16 -05:00

Merged #2 docs(plan): record the org lead's decisions and design against them 2026-08-19 18:26:25 -05:00

Merged #1 docs(plan): the design of record for runicgateway.com 2026-08-19 15:09:08 -05:00